Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/htdocs/cogerimo/public/wp-content/plugins/revslider/includes/operations.class.php on line 2695
Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/htdocs/cogerimo/public/wp-content/plugins/revslider/includes/operations.class.php on line 2699
Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /var/www/htdocs/cogerimo/public/wp-content/plugins/revslider/includes/output.class.php on line 3581
Deprecated: Unparenthesized `a ? b : c ? d : e` is deprecated. Use either `(a ? b : c) ? d : e` or `a ? b : (c ? d : e)` in /var/www/htdocs/cogerimo/public/wp-content/plugins/js_composer/include/classes/editors/class-vc-frontend-editor.php on line 644 Meeus – COGERIMO
Login
Register
User registration is disabled in this demo.
Reset Password
Please enter your username or email address. You will receive a link to create a new password via email.
The building is located on one of the most beautiful historic squares in Brussels, in the heart of the European district, at the corner of rue du Luxembourg and square de Meeûs. The building comprises the Ground floor and 7 levels with a total of 5,235 sqm.
Technical specifications
• 1965: Construction of the building
• 2000: major renovation
• 2016: replacement of all the fan coils.
• Glazed walls façade;
• Thermally broken aluminium frames equipped with
high-performance insulating double-glazing;
• Modulation: 1.72 m/0.86 m.
• Gas central heating: air conditioning with fan coils along the walls
• Lifts: 3 sets of lifts with a capacity of 630 kg/8 persons each.
• Suspended ceilings with metallic acoustic panels with encased low energy lighting.
• Raised IT computer floors
Location & Transports
Gare du Luxembourg railway Station, Metro Station and bus stops in close proximity